Break Down a 100-Page RFP Packet Into Go/No-Go Bid Criteria

Extract mandatory qualifications, scoring weights, security certifications, and killer disqualifiers from enterprise or government RFP packages in minutes.

Copy the prompt and paste it into the AI assistant you already use.

Checklist for rapid Go/No-Go triage on complex RFPs

  1. 01

    Surface hard eligibility gates first

    Check minimum revenue, ISO/SOC2/FedRAMP mandates, local presence rules, and insurance minimums before writing a single proposal line.

  2. 02

    Decode the evaluation scoring formula

    Verify whether technical excellence outweighs lowest-price scoring so you know if premium capabilities can actually win.

  3. 03

    Catch conflicting instructions across annexes

    Submission formatting rules in Section L often clash with SOW deliverables in Attachment B; flag ambiguities before Q&A closes.

  4. 04

    Isolate non-negotiable contract flow-downs

    Spot unlimited liquidated damages or IP transfer clauses attached to the RFP early so legal does not veto the bid at submission.

How it works in practice

Buried Municipal RFP Clause (Section 4.18.3 & Annex C)

Offerors must demonstrate three (3) completed deployments for public transit agencies exceeding 400 vehicles within the preceding 36 months. Proposals omitting signed client attestations in Tab 6 shall be deemed non-responsive without technical scoring. Pricing carries 30 points; Technical Approach 45 points; Local Disadvantaged Subcontracting (min 15% contract value) 25 points.

Go/No-Go Triage Card

• Hard Gate #1: 3 public transit rollouts (>400 vehicles) in last 36 mos + signed client forms in Tab 6 (auto-disqualifier). • Hard Gate #2: Minimum 15% local disadvantaged subcontractor allocation (25% of score). • Scoring Split: 45% Technical / 30% Price / 25% Subcontracting.

Prevents wasted weeks on a bid where a Tab 6 attestation or subcontracting rule disqualifies you.

Common questions

What causes most teams to lose RFPs on technicalities?

Mandatory formatting rules, wet-signature forms, or past-performance attestations buried in secondary appendices often trigger automatic administrative rejection.

How fast should a proposal team complete initial RFP triage?

Ideally within hours of release so capture managers can submit sharp clarifying questions before the procurement Q&A window shuts.

Can SOW scope items be separated from boilerplate procurement clauses?

Yes, isolating functional deliverables from standard statutory boilerplate lets engineering estimate delivery effort accurately while legal reviews terms separately.

Learn more